Adding to the articles printed on the RAFBHA newsletter, “View from the Tower” and past blogs, the Ramey ATC Tower carries on towards completion.
The base for the “Elevator Tower” was placed a couple of months ago. An enormous 20’x30’ rebar cage, five feet in height, was buried and covered with six truck full’s of concrete.
Access to the elevator will be thru the “south/west” side of the tower.
The elevator structure will join to the ATC Tower thru a walkway connected to the upper level “window”, now enlarged, seen here in the picture.
The project is scheduled to be finished by the end of February 2014.